Introduction Of Multan Irrigation Zone

Introduction Of Multan Irrigation Zone

Multan Irrigation was created on 25.03.1968. The Zone is controlled by the Chief Engineer with help of the 04 Nos Superintending Engineers. This zone is consisting on 03 Canal Circles and 01 Development Circle namely, Haveli Canal Circle, at Multan, Mailsi Canal Circle, at Multan, Nili Bar Circle, at Sahiwal and Development Circle, Multan Zone, at Sahiwal. The circle is controlled by Superintending Engineer with help of Executive Engineer, Sub Divisional Officer, Deputy Collector, Zilladar, Sub Engineer and other technical and office staff. The Index Plan of Multan Zone is as under 

The main sources of the supply of water are Mangla Command and Tarbela Command. The 04 Nos. Barrages/Headworks are fall in this zone.

The name and capacity of the Barrages/Headworks are as under

Trimmu Barrage is on River Chenab with capacity 6.45 Lac Cs

Name of the Project Trimuu Barrage
Year of Construction 1938-39
No of Bay of Main Weir 37 No each having 60 wide
Designed Capacity 6.45 Lac Cs
Off Taking
Haveli Main Line 5170 Cs
Trimmu Sidhnai Link 12500 Cs
Rangpur Canal 2170 Cs/1800 Cs
Flood Level
Low 1.50 Lac Cs
Medium 2 Lac Cs
High 3 Lac Cs
Very High 4.50 Lac Cs
Exceptionally High 6.00 Lac Cs
Maximum Flood Record
1959 9.43 Lac Cs
1973 7.33 Lac Cs
1952 8.88 Lac Cs

Sidhnai Barrage is on River Ravi with capacity 1.50 Lac.Cs

Name of the Project Sidhnai Barrage
Year of Construction 1960
No of Bay of Main Weir 11 No each having 40 wide
Designed Capacity 1.50 Lac Cs
Off Taking
Sidhnai Canal 4005 Cs
Sidhnai Mailsi Link 11300 Cs
Flood Level
Low 0.30 Lac Cs
Medium 0.45 Lac Cs
High 0.60 Lac Cs
Very High 0.90 Lac Cs
Exceptionally High 1.20 Lac Cs
Maximum Flood Record
1973 2.09 Lac Cs
1976 2.43 Lac Cs
1988 3.32 Lac Cs

Sulaimanki Headworks is in River Sutlej with capacity 3.25 Lac.Cs

Name of the Project Sulaimanki Headworks
Year of Construction 1922-27
No of Bay of Main Weir 24 No each having 60 wide
Designed Capacity 3.25 Lac Cs
Pond Level 569.0
Off Taking
Upper Pakpattan Canal 5600 Cs
Eastern Sadiqia Canal 5230 Cs
Fodwah Canal 3447 Cs
Flood Level
Low 0.50 Lac Cs
Medium 0.80 Lac Cs
High 1.20 Lac Cs
Very High 1.75 Lac Cs
Exceptionally High 2.25 Lac Cs
Maximum Flood Record
1950 3.32 Lac Cs
1955 5.97 Lac Cs
1988 5.00 Lac Cs

Islam Headworks is on River Sutlej with capacity 3.00 Lac.Cs

Name of the Project Islam Headworks
Year of Construction 1922-27
No of Bay of Main Weir 24 No each having 60 wide
Designed Capacity 3.00 Lac Cs
Pond Level 569.0 Lac Cs
Off Taking
Under Bahwal Canal 5400 Cs/1000 Cs
Qaim Canal 483 Cs
Flood Level
Low 0.50 Lac Cs
Medium 0.80 Lac Cs
High 1.20 Lac Cs
Very High 1.75 Lac Cs
Exceptionally High 2.25 Lac Cs
Maximum Flood Record
1955 4.92 Lac Cs
1988 3.06 Lac Cs
1995 1.83 Lac Cs