Home
080011333
WRMIS Login

Design Directorate

Introduction

Design/review of irrigation infrastructure and to suggest design oriented remedial measures for the problem/issues referred by field formations.

BACKGROUND

  • Established in 1926 in public works department.
  • Attached to wapda in 1958 for designing indus basin replacement works.
  • Re-establihed in 1973 in i&p department punjab.
MAJOR ASSIGNMENTS CARRIED OUT IN PAST
  • 5 nos small dams in the potohar area.
  • Outfall structure of B.S Link.
  • Tail regulator of D.G.Khan canal and fall structures of link-III.
  • Bambawala head regulator and subsidiary weir.
  • Head regulator and cross regulators of B.S Link-I and allied bridges.
  • Head regulator and cross regulators of  Hakra & Eastern canals & bridges.
  • Cross regulators / syphons of LBDC.
  • Hydraulic structures,bridges of MBL of BRBD, PML(U), UCC, LJC & Southern Branch.
  • Bridges on Aik-Nullah, Eastern Saddiqia  Canal, southern branch, UCC, Niki Dek Drain, T.S link  and Thal Canal (MLU).
  • R.C.C slab on combined railway & village road bridge rd 8+212 of T.S link.
© 2017, PMIU (Irrigation Department)
feeling-nominal