Home
080011333
WRMIS Login
› Introduction
› Budget
› Contact Us

Development Zone

Introduction:

  1.   De-silting & excavation of drains / canals and cunnets for river training works, construction and repair   of flood embankments and spurs (earthen part) through fleet of heavy earth moving machinery.
  2.    Fabrication, repair and installation of gates and gearing system at barrages and canal regulators, repair  of earth moving machinery and vehicles.
  3.   Operation & maintenance of earth moving machinery.
  4.   Desilting & excavation of drains / canals.
  5.   Excavation of cunnets for river training works.
  6.   Construction & repair of flood embankments and spurs (earthen part).

Organogram of Development Zone:

Category of Post

BS

Sanctioned Strength

Working Sanctioned

Vacant Posts

Chief Engineer

20

01

01

00

Superintending Engineer

19

03

03

00

Executive Engineer (OP)

18

01

01

00

Executive Engineers

18

07

07

00

Sub Divisional Officer/ADE

17

01

00

01

Sub Divisional Officers

17

15

12

03

Sub Engineers

14

53

33

20

TOTAL

 

81

57

24

© 2017, PMIU (Irrigation Department)
feeling-nominal